1970-80
- The first domestic ammonia synthesis units of 600 and 1360 tons/day were designed and manufactured. The equipment was modernized.
- The design and manufacture of the first large-sized high-pressure vessels was assimilated.
- The equipment for lines of vegetable feed hydrolysis by concentrated acids with a capacity of 4.75 tons of monosaccharides per hour was designed and implemented.
- According to the Institute technical documentation, production and delivery of high-pressure pipelines in batch for large-capacity ammonia production facilities have been performed.
- Auger-drill hydrolyzer for moss young peat was developed and manufactured.
- Series production of fermenters for antibiotics and enzyme production was set up.
- High-pressure equipment was designed: new production facilities of synthetic fatty alcohols for the Shebekinsky chemical combine; of ethyl alcohol for Kuibyshev, Ufa and Grozny alcohol synthesis plants; of butyl alcohol for Angarsk petrochemical combine.
- High-pressure equipment of furfuryl and tetrahydrofurfuryl alcohol unit for Kirov biochemical plant was created.
- Autoclaves to obtain artificial quartz were introduced.
- An industrial wastewater liquid-phase oxidation unit for Monino worsted combine.
- Agricultural enzymatic agents production processing line equipment with the performance of 250 tons/day of equivalent and continuous single-phase vegetable feed hydrolysis unit with the performance of 12 tons/hour with top feed were developed and manufactured.
- High-pressure vessel core fastener engine driven tensioning unit was constructed.
- The unique closed circulation circuit to test the main circulating pumps (GCN-200000) for nuclear power plant was manufactured.
- Domestic pipeline fittings production to use in a high-pressure polyethylene production facility was organized. Documentation on pipeline fittings under pressure 150 MPa was developed.
- Yeast propagators were developed and set up into series production: for the protein-vitamin concentrates from oil n-paraffins (ADR-960-76) and nutrient yeast from vegetable feed (EVC-1250, 650, 320 m3).
- Jet fermenter to produce proteinous-vitamin concentrations from natural gas was designed and manufactured.
- Unit equipment to cultivate pure culture yeast used in furfural production processing line with a capacity of 12,000 tons/year and 38,000 tons/year of yeast was developed and manufactured.
- A titanium alloy hydrolysis apparatus of intermittent action V = 50 m3 was designed and manufactured.
- Eddy-current testing unit to inspect strip panel welds used during fabrication of high-pressure scroll vessels was designed and implemented.
87400cookie-check1970-80no